The requirement design of
superheater will be better to establish before manufacturing process will be
performed. The design superheater should provide uniform distribution of steam and temperature
at all loads, and provides thermal expansion of headers, tubes, spacers and
supports, and should be accessible for cleaning, examination and removal of
elements.
The designer of steam boiler should
arrange the superheater tube banks as conveniently as possible to perform
maintenance and periodic inspection. The requirement should describe what
programs are being undertaken, if any, to resolve problems of gas side
corrosion and erosion of superheater tube materials at elevated temperatures.
Horizontal tube sections of
superheater should be arranged with sufficient clear spacing between tubes in
the gas flow at least equal to tube diameter and such as to avoid slag
formation. Tubes should be arranged in parallel rows. Horizontal tube banks in
the convective pass may have minimum baffles installed for the prevention of
acoustical standing wave formation.
The wall thickness for
superheater tubes, at least, should have a corrosion and/or erosion allowance
of not less than 0.5 mm. All superheater tube joints including connection to
headers should be of welded construction in accordance with ASME BPV Section l.
Superheater tubes should be
arranged and terminated in outlet headers in a manner which will yield through
mixing of the steam, thereby resulting in the same temperature at each of the
main steam outlets. The superheater arrangements should be provided so that by
the arrangement of the connecting tubes and by the mixing points a uniform flow
admission and sufficient temperature balance are insured.
Tube connections should be
shop-welded stub ends on headers. Stub ends should be prepared for field
welding of superheater tubes. Any welding of ferritic to austenitic stainless
metals should be done in work shop.
Spacers and hangers for
superheater tubes should be designed to provide for appropriate sliding
expansion, and should be of material suitable for temperature encountered. All
headers should be external to the gas stream and should be provided with welded
inspection hole covers as required for inspection. The header in the gas stream
should be shield to avoid header damage caused by the flue gas. Inlet and
outlet headers and/or lead pipes should have thermo wells with thermocouples
and connections for pressure gauge, lest gauge and transmitter should be furnished. The design superheater must be equipped also with desuperheater and safety valve to control pressure and temperature.
Based on description above, requirement
design of superheater is a must to be performed prior to begin manufacturing
process to get high performance and efficiency.