Design steam drum and water drum
is important step in design steam boiler due to mechanical design and
performance design. Steam drum and water drum are two of pressure part in
boiler. The steam drum should be furnished with internals which at least
include hydraulic baffle, mesh dryer screens to meet the required steam purity,
and blowdown connection. Also, the drum internals are protected from any
possible attack by the chemicals and there is no chance of chemicals short-circuiting
and being discharged through the continuous blowdown system.
The water drum size is dependent
on the number of tubes deep in the boiler bank. The chemical feed connection
could be located on the water drum. By placing the chemical feed on the water
drum the chemicals combine with the circulating water and are better mixed
before entering the steam drum.
The drums should be of fusion
welded construction fabricated from carbon steel plate and should be equipped
with 450 mm diameter manholes on both end plates of the drum to permit access
into the drum interior. All faces between manholes and drum plates should be
fabricated and machined so as to obtain a perfect seal.
Necessary welding end inlet and
outlet connections and nozzles are provided to accommodate the required valves
and accessories. Steam drum should be provided with the necessary connections,
such as safety valves, continuous bIowdown, water level and pressure measuring instruments,
vents, etc.
Sufficient thermocouples should
be provided on the drum shell. The metal temperature should be measured as
input data to the plant computer which should be furnished in the computer
room.
All connection openings should be
protected with caps before shipment. Drum should be capable of complete drainage
so as to assure the dry preservation of boiler when not in service. Pipes
carrying the saturated steam from the boiler drum to the superheater should be
evenly spaced on the drum and designed so that an adequate distribution of
steam will be obtained for the superheater.
Necessary drum supports, such as
U-bolts and nuts, should be furnished. Continuous steel rings for insulation
support around manholes should be welded on the drum. Two (2) multiple port
type drum water level assemblies, two (2) level transmitter pressure gauges and
other necessary accessories should be provided on the drum. Boiler water level should
be indicated on operator monitor in the central control room.
Insulation and jacketing should
be installed on boiler drum and necessary fittings should be assembled and
welded in the manufacturer's shop before shipment. Field welding of parts or
fittings should be minimized. A single pass - cross flow or multiple passes
generating bank design should be furnished. The generating bank should employ a
400 mm central access cavity for maintenance.
The tubes are rolled during
erection into the steam and water drums without any butt welds. The entire
generating bank sidewall construction features finned tubes will eliminates the
need for an inner casing. Where header/drum ends are attached by welding this should
be by using a fully penetrating plain butt weld joint.
Drums and headers should be self
draining and provided with drain valves. Design headers / design steam drum and
water drum material should be in accordance with ASME Boiler & PV SectionII D.